Catch missed daily plant checks at the weekly PUWER inspection

This release is almost all about the weekly plant inspection: doing it in the app, and making it check that the daily checks actually happened.

What's new

  • Start the weekly inspection from the plant, whenever it suits. "Start inspection" on the plant page, the inspections-due page and the plant list opens the PUWER inspection form in place, and on the plant list it becomes the row's next step once the inspection is due soon or overdue. You can start one before it's due, and opening it again picks up the form in progress rather than starting a second.
  • Take the form out to the machine. On a phone the form opens full screen, and a form-only view drops the rest of the app so the supervisor can fill it in standing next to the plant.
  • See the week's daily checks before you sign. Above the form, each day since the last inspection shows who did the check, when, and whether it passed, raised a defect or was missed, and opens to what was logged. You can close a defect there with a note and give a reason for a missed day. The review is saved with the inspection and can't be edited, and if the plant has no daily check it says so rather than reading as a clean week.
  • Spend less time on the boilerplate. Identification mark, inspection date, last and next inspection dates, inspector and report reference are filled in for you, and you can still change them.
  • Don't record plant as safe over an open defect without a reason. While a defect is open, an open stop-work defect has to be cleared or the plant recorded as not safe, and a lesser one needs "Yes, subject to the remedial actions recorded". If the inspector disagrees with the defect, they can go ahead by giving their reason, which is kept with the inspection.
  • Follow up when the daily checks aren't being done properly. If the inspector records that they aren't, PlanOps raises a high-priority task, due in two working days, for the supervisor named on the daily check (or the site or project manager), with what the inspector wrote.
  • See a machine's past inspections. "View past inspections" lists each one with its date, reference, inspector, outcome and whether the daily checks were working, linked to the full record.
  • Smaller things. A package's start and finish dates now come from the programme: enter one on the package and it's written to the programme, and actual finish dates come in from Microsoft Project and CSV imports. "Create handover" on a package now starts the pack you collect from its installing subcontractor, and asks you to pick one if none is set. Handover board rows now fit narrower screens without squeezing the title to a few characters.

Why it matters

A weekly inspection that only looks at the machine on the day says little about the six days in between. Putting the daily checks in front of the inspector means a run of missed checks, or a defect nobody closed, is picked up and handed to someone while the plant is still on site. It also leaves a record showing the inspector saw them, which is what you'll want if anything happens to that machine later.

New featureImprovementPlantProgrammeHandover