Prove hidden work before it's covered, and see whose plant is whose

Most of this week's changes are about evidence: proof of work before it's hidden, plant records that match what's actually on site, and handover packs that count properly.

What's new

  • Have proof of hidden work before it's covered. An ITP item for concealed work, such as fire stopping, cavity barriers or drainage before backfill, can now only pass once its photos and the inspector's signature are on record. Where an item needs two people, a witness from another company signs as well. On the phone, what's still missing shows next to the pass button, and you can note where the work is in words or with the phone's position.
  • Decide where that proof applies. From the ITP you can switch the requirement off for a package where it doesn't fit, and choose one signer or two for each concealed item. It's on by default, so hidden work is never left unprotected because nobody set it up.
  • See which subcontractor each machine belongs to. Set an owner on an item of plant (the company responsible for it on the project, usually the subcontractor using it), separate from the hire company. You can filter the Plant board by owner, and a company's page now lists its plant. An "Owner" column in a plant import fills it in.
  • Put plant on hire by printing its sticker. Printing the QR sticker for requested or confirmed plant now moves it to On hire, with today's date as the on-hire date if none was set, because a sticker only goes on a machine that's on site. Reprinting a sticker never puts off-hired plant back on hire.
  • Keep the Plant board to what's on site. Off-hired plant now sits in a closed "Off hired" section with its count, and the status counts at the top cover on-site plant only.
  • Issue an outbound handover with an online view. Packs issued with an online view and an expiry date now build properly. If part of a delivery does fail, the Delivery tab says what didn't build and keeps what did.
  • See where each take-off quantity came from. For organisations using quantity take-off in early access, the Schedule of Materials now totals accepted quantities only and shows candidates apart, labelled. Each line shows the view and scale it was measured from, and the evidence keeps separate whether an item was identified, its quantity checked and its specification confirmed. The schedule also waits for the drawing to finish processing before it can be generated, rather than failing part-way.
  • Try a take-off on one drawing for free. quantitytakeoff.co.uk takes a single drawing sheet and returns a draft schedule, with tagged items counted and marked where they were found, and lengths and areas offered as candidates to check. It's free, in development and limited to five sheets a day.
  • Smaller things. An outbound handover's next step on the board now fits outbound work (attach the evidence, approve, issue, record the client's acknowledgement) instead of offering to chase a subcontractor. Plant added by hand gets a title from its category and description, and a plant check's chase message names the responsible role in plain words.

Why it matters

Once the boards are on, the only evidence of the fire stopping behind them is whatever was recorded beforehand. Holding the pass until the photos and signatures exist means that evidence is there when the client, the fire engineer or the building control body asks for it, rather than pieced together at handover.

New featureImprovementITPPlantHandoverQuantity take-off

Tell your project what you need.

Start free with 50 IU. No credit card, no training, no waiting.