All workflows
Compliance & Assurance~15 minutesintermediate1 AI step

Assess and create temporary works items

Work out what temporary works your project needs from the drawings and programme, then get a BS 5975 register entry raised for each one, ready to design-check, sign off and inspect.

What you walk away with: A temporary works schedule read out of your drawings and programme against UK guidance (BS 5975:2019, CIRIA, the TWf and HSE), with a compliant register entry created for each item. Every item carries its details, sign-offs under BS 5975, and links to the package and RAMS it belongs to, so the temporary works co-ordinator can see what needs designing, checking and inspecting — and you have a register you can defend at audit.

The 7 steps

Expand any step for the detail - guides for the steps you do, the inputs and outputs for the steps PlanOps runs.

Steps marked AI task are done for you by a PlanOps assistant.

Written for: temporary works coordinator, project manager, health and safety manager

A temporary works register with an item raised for every temporary works the project needs, each linked to its package and RAMS and ready for sign-off.

Start free with 50 Intelligence Units. Every step here works on day one.

Start free