Drawings workflow

Drawing revisions in PlanOps

A revision costs money when a change nobody owns turns up on site. PlanOps compares every revision as it arrives and keeps each change as a record until it’s dealt with.

The complete run

From the revision arriving to the change being closed

  1. 1

    The revision arrives

    A new issue lands from the designer. The drawing number and revision are read from the sheet and it is filed against the drawing it revises, so the set always knows which issue is current.

  2. 2

    It is compared with the one before

    Every revision is compared with the previous issue as it arrives, and any two revisions of a drawing can be compared on request - P04 against P06, say - not only the latest pair.

  3. 3

    Each change becomes a record

    Every difference found is written to the project as a change: what moved, where on the sheet in words, how much it matters and whether it is likely to cost something. Re-running a comparison refreshes a change rather than duplicating it.

  4. 4

    Someone decides what to do about it

    From the change itself: mark it seen, ask the engineer by raising an RFI, give it to someone as a task, or flag it to commercial. The RFI or task stays linked to the change that caused it.

  5. 5

    It is tied to the work it affects

    A change carries the packages its drawing is linked to, so the subcontractor whose RAMS and programme rest on that sheet can be told. Where the project assesses quantities, the quantity changes are recorded as well.

  6. 6

    It stays on the record

    A drawing change register - by issue or by package - is generated, versioned, printed and exported like any other project register, with the issue named by its sheets, sender and date and a count of what is still open.

Two ways to compare

Compare one sheet free. Manage every revision in PlanOps.

Free · one sheet

Drawing Comparison

Go to drawingcomparison.co.uk and upload two revisions of one sheet. No account is needed.

  • One sheet, two revisions, uploaded by hand
  • Single-page files only; drawing numbers checked first, so a mismatched pair is refused
  • Findings pinned on the sheet, with a plain description of each
  • A private link that expires, then the images and findings are deleted
  • No drawing set, no register, nothing linked to the work

Full workflow · every revision

Drawings in PlanOps

  • Every revision compared with the one before as it arrives, and any two on request
  • Each change kept as a record with a state, an owner and a history
  • RFIs and tasks raised from the change and linked back to it
  • Changes carried to the packages the drawing is linked to
  • A drawing change register by issue or package, printed and exported
  • The rest of the project alongside - RAMS, RFIs, programme and documents

Reference

Free guidance on drawing revisions